New material keeps on trucking in. Yesterday The shower Bases for both bathrooms were set and both bath tub cutouts where set in. Solar panels were installed on the roof and brick work continued after the 4 day Cup long weekend. The plastering for the main part of the house is essentially done and the designer series bulk heads look brilliant as does the square cut ceiling we choose for downstairs.
Some guy I know, a very famous DJ in a black Audi R8 (V10) dropped in for a peak, the irony is that his car cost around the same as the house. His car is so fast, I swear, it felt like we travelled back in time. This car uses one of the latest flux capacitors released by Audi.
Kitchen, bathrooms, powder and laundry and butlers pantry cabinets have all been delivered ready for install. Must say we are very happy with he colour choice and the soft close option just tops off the total effect.