Metricon Phoenix Mod 43

Metricon Phoenix Mod 43
Entry Digital - keyless

Monday, 5 April 2021

Outdoor Room Upgrade !!

 Outdoor Roomification


Finally roomified our outdoor room - New TV, Heater, 2 x Weber Barbie setup and designer fretwork, sound system, fridge and sink revamp now DONE1 






Saturday, 21 September 2019

Japanese Lanterns

Inspired by several visits to Kyoto Japan we have gone a bit crazy on the Japanese lanterns - but hey they look great and the soft warm white light in the garden at night time is amazing.




Saturday, 16 February 2019

Butlers Bar / Pantry Upgrade now complete


With the help of iKEA and a little imagination the upgrade to the Butlers Pantry is now complete and Open for business




Monday, 30 October 2017

Metricon Failure

We have tried to contact Metricon over a serious statutory warranty claim regarding an extremely serious and dangerous product failure. Nothing back from Metricon over two months of trying to get a response.

The Zampatti Oven temperature switch has failed and fallen back inside the oven. It seems the recess switch mounting had become brittle and completely failed.

This dangerous issue should be immediately referred to Energy Safe Victoria, and a total product recall instigated immediately. Do we instigate the product recall proceedings or should Metricom? or do we go straight to Tracy Grimshaw and then Metricon customer service might respond to this serious and dangerous situation

Are they waiting for someone to be electrocuted ???





Monday, 3 April 2017

Tile Time

Thanks to the closure of Masters - Don't you just love competition The Artisan time range which were like $6.50 EACH (ouch) were sold at a drop your pants rate of just $2.00 so it was time to get the two upstairs bathrooms Fully Tiled = floor to ceiling here is the result...


Baby Cave

We opted for a 3 car Garage which was actually a 2 Car Garage with a Storeroom complete with full insulation and normal room and power point lighting. So it was a space waiting to become a room,

Thanks to Masters closing down I hatched a plan and I went on a daily hunt for materials for the Man / Baby Cave Project.

  • Timber stud work saved 60 % but bought 25% too much so it's ended up really strong
  • Installation 60% off but bought 25% too much
  • Door hardware 80% off
  • Timber Flooring saved 50% and got that Perfect
  • Paint 40% off Perfect
  • Solid Timber 8 lite door and Cavity slide 50% off Perfect
  • Solid Timber skirting and trim 80% off - Respect
all up timber, insulation, flooring etc, etc cost only $670, add some help and plaster from AirTasker to whole thing cost only $1,570 - Amazing. Here are some Picks.